Tuesday 14 April 2015

Assembly Foldable Six Rung



Assembly Foldable Six Rung

1. BUILDING PROCESS – 1 metre Platform Height
  1. 1. Insert casters into the folding frames. Lock 2 castors in one frame and roll the other frame outwards until the folding diagonal braces lock. Lock the other 2 castors. Clip one horizontal brace to the frame lowest rung. See pic A.
  2. 2. Clip 1 horizontal brace either side of the frame on 6th rung. See Pic B
  3. 3. Clip 1 horizontal brace to the 4th rung opposite the diagonal braces.
  4. 4.Fit trapdoor platform to the 3rd rung & engage wind lock. See Pic C.

No comments:

Post a Comment